BEAD project
Zito-Graham-1 (CM61-BEAD-NC-1000026263-1)
Official project code: CM61-BEAD-NC-1000026263-1
Zito-Graham-1 (CM61-BEAD-NC-1000026263-1) is a broadband project record in North Carolina. Recorded technology: Fiber. Reported award: not reported. Linked award holder: Zito Media.
Sources: NTIA dashboard extractSummary from published records · Source as of: Apr 13, 2026 · Materially updated:
Key facts
- Official project code
- CM61-BEAD-NC-1000026263-1 Sources: NTIA dashboard extract
- Project state or territory
- North Carolina Sources: NTIA dashboard extract
- Reported award
- Not reportedReporting period: 2026-04-13 Sources: NTIA dashboard extract
- Planned service locations
- Not reportedReporting period: 2026-04-13 Sources: NTIA dashboard extract
- Recorded deployment technologies
- Fiber Sources: NTIA dashboard extract
- Project award status
- Provisional Sources: NTIA dashboard extract
- Planned start
- Not reportedPlanned date — not evidence that work occurred. Sources: NTIA dashboard extract
- Planned completion
- Not reportedPlanned date — not evidence that work occurred. Sources: NTIA dashboard extract
An award is not an open solicitation, revenue, cash received, or guaranteed contractor demand. A planned date alone does not establish construction or completion.
Description supplied by the source
Zito Media proposes to deploy a Fiber-to-the-Premise (FTTP) broadband network based on XGS-PON architecture, delivering symmetrical speeds of at least 100 Mbps and up to 1 Gbps (upgradeable to 10 Gbps) to 1,522 unserved and underserved Broadband Serviceable Locations (BSLs). The network design includes Optical Line Terminals (OLTs) installed at regional headends or remote cabinets, with dedicated fiber drops to each serviceable location. The project will utilize both aerial and underground construction methods, with path diversity and capacity augmentation plans to maintain performance. Backhaul will be provided through Zito’s IP/MPLS core network (AS26801), with multiple 10 Gbps or greater links connecting to national internet points of presence. Network performance will be monitored continuously, with capacity expansions triggered by utilization thresholds to ensure compliance with BEAD performance standards.
Sources: NTIA dashboard extractRelated records
Same state and a recorded technology
Cherokeeproject
Recorded deployment technology
Fiber BEAD projectstechnology
Same state and a recorded technology
GRAHAMproject
Same state and a recorded technology
Johnston County, NCproject
Project location
North Carolina BEAD marketstate
Stage evidence guide
Provisional BEAD projectsstage
Linked award holder
Zito Mediacompany
Limitations and interpretation
- An award is a research signal. The award holder decides its own bids and subcontracts. Confirm project status and vendor needs with them.
“Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
Sources and evidence
- NTIA dashboard extractAs of: Apr 13, 2026 · Record: ntia_powerbi:NC:CM61-BEAD-NC-1000026263-1