BEAD project
HarvestBeam Moore County Expansion (CM61-BEAD-NC-1000026517-1)
Official project code: CM61-BEAD-NC-1000026517-1
HarvestBeam Moore County Expansion (CM61-BEAD-NC-1000026517-1) is a broadband project record in North Carolina. Recorded technology: Fiber. Reported award: not reported. Linked award holder: HarvestBeam Inc..
Sources: NTIA dashboard extractSummary from published records · Source as of: Apr 13, 2026 · Materially updated:
Key facts
- Official project code
- CM61-BEAD-NC-1000026517-1 Sources: NTIA dashboard extract
- Project state or territory
- North Carolina Sources: NTIA dashboard extract
- Reported award
- Not reportedReporting period: 2026-04-13 Sources: NTIA dashboard extract
- Planned service locations
- Not reportedReporting period: 2026-04-13 Sources: NTIA dashboard extract
- Recorded deployment technologies
- Fiber Sources: NTIA dashboard extract
- Project award status
- Provisional Sources: NTIA dashboard extract
- Planned start
- Not reportedPlanned date — not evidence that work occurred. Sources: NTIA dashboard extract
- Planned completion
- Not reportedPlanned date — not evidence that work occurred. Sources: NTIA dashboard extract
An award is not an open solicitation, revenue, cash received, or guaranteed contractor demand. A planned date alone does not establish construction or completion.
Description supplied by the source
HarvestBeam proposes to connect over 509 BEAD eligible residential units throughout Moore County with 40 MHz of Priority Access Licensed spectrum (PAL’s) in the CBRS band as well as 40Mhz of Generally Available Access (GAA) spectrum and 80 MHz of unlicensed spectrum in the 6 GHz band to deliver up to 641 Mbps downlink and 143 Mbps uplink with a typical roundtrip latency of 10 Milliseconds. The project utilizes two towers: one owed by Riverstreet networks and one owned by American Tower Corporation (ATC) to deploy Tarana G1 wireless Base Nodes and Residential Nodes in the 3.5Ghz (CBRS) and 6 GHz bands. HarvestBeam will also utilize both licensed 11 GHz microwave backhaul and fiber backhaul to transport traffic to and from the DIA located at a central office owned by Riverstreet Networks, at 254 2nd St Ellerbe NC.
Sources: NTIA dashboard extractRelated records
Same state and a recorded technology
Cherokeeproject
Recorded deployment technology
Fiber BEAD projectstechnology
Same state and a recorded technology
GRAHAMproject
Linked award holder
HarvestBeam Inc.company
Same state and a recorded technology
Johnston County, NCproject
Project location
North Carolina BEAD marketstate
Stage evidence guide
Provisional BEAD projectsstage
Limitations and interpretation
- An award is a research signal. The award holder decides its own bids and subcontracts. Confirm project status and vendor needs with them.
“Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.