Skip to directory content

BEAD project

Trace Fiber Networks, LLC. - Trace Fiber Networks Chickasaw Country Project 7 (CM61-BEAD-OK-54-3154)

Official project code: CM61-BEAD-OK-54-3154

Trace Fiber Networks, LLC. - Trace Fiber Networks Chickasaw Country Project 7 (CM61-BEAD-OK-54-3154) is a broadband project record in Oklahoma. Recorded technology: Fiber. Reported award: not reported. Linked award holder: Trace Fiber Networks.

Sources: NTIA dashboard extract

Summary from published records · Source as of: Apr 13, 2026 · Materially updated:

Key facts

Official project code
CM61-BEAD-OK-54-3154 Sources: NTIA dashboard extract
Project state or territory
Oklahoma Sources: NTIA dashboard extract
Reported award
Not reportedReporting period: 2026-04-13 Sources: NTIA dashboard extract
Planned service locations
Not reportedReporting period: 2026-04-13 Sources: NTIA dashboard extract
Recorded deployment technologies
Fiber Sources: NTIA dashboard extract
Project award status
Provisional Sources: NTIA dashboard extract
Planned start
2026-01-06Planned date — not evidence that work occurred. Sources: NTIA dashboard extract
Planned completion
2026-12-31Planned date — not evidence that work occurred. Sources: NTIA dashboard extract

An award is not an open solicitation, revenue, cash received, or guaranteed contractor demand. A planned date alone does not establish construction or completion.

Description supplied by the source

race Fiber Networks LLC proposes to deploy a future-ready fiber-to-the-premises (FTTP) broadband network under the Oklahoma BEAD “Benefit of the Bargain” program as part of Chickasaw Country Project 7. The project will deliver high-speed, symmetrical broadband service to more than 1,000 unserved and underserved locations across rural Oklahoma using 100% buried fiber construction. This infrastructure will support gigabit-capable service (minimum 1 Gbps symmetrical), meeting or exceeding all BEAD speed, reliability, and latency standards.\\n\\nThe service area includes a mix of residential homes, small businesses, and community anchor institutions (CAIs) currently lacking adequate broadband connectivity. This targeted expansion is designed to close service gaps in difficult-to-reach rural areas by leveraging Trace Fiber Networks’ existing middle-mile backbone and regional Points of Presence.\\n\\nThe proposed network will be constructed over a 12- to 18-month deployment period and will include full environmental compliance, redundant routing, and climate-resilient design. Trace Fiber Networks will offer a low-cost service tier of $59.95/month for 100 Mbps download and 20 Mbps upload, available universally without eligibility screening. The project also incorporates local workforce hiring, apprenticeship opportunities, and long-term operational sustainability through ongoing reinvestment and subscriber growth.

Sources: NTIA dashboard extract

Related records

Limitations and interpretation

  • An award is a research signal. The award holder decides its own bids and subcontracts. Confirm project status and vendor needs with them.

“Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.

Sources and evidence

  1. NTIA dashboard extractAs of: Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-54-3154