BEAD project
Choctaw Nation of Oklahoma - South Hodgen Project (CM61-BEAD-OK-262-2128)
Official project code: CM61-BEAD-OK-262-2128
Choctaw Nation of Oklahoma - South Hodgen Project (CM61-BEAD-OK-262-2128) is a broadband project record in Oklahoma. Recorded technology: Fixed Wireless. Reported award: not reported. Linked award holder: Choctaw Nation of Oklahoma.
Sources: NTIA dashboard extractSummary from published records · Source as of: Apr 13, 2026 · Materially updated:
Key facts
- Official project code
- CM61-BEAD-OK-262-2128 Sources: NTIA dashboard extract
- Project state or territory
- Oklahoma Sources: NTIA dashboard extract
- Reported award
- Not reportedReporting period: 2026-04-13 Sources: NTIA dashboard extract
- Planned service locations
- Not reportedReporting period: 2026-04-13 Sources: NTIA dashboard extract
- Recorded deployment technologies
- Fixed Wireless Sources: NTIA dashboard extract
- Project award status
- Provisional Sources: NTIA dashboard extract
- Planned start
- 2026-01-01Planned date — not evidence that work occurred. Sources: NTIA dashboard extract
- Planned completion
- 2028-12-31Planned date — not evidence that work occurred. Sources: NTIA dashboard extract
An award is not an open solicitation, revenue, cash received, or guaranteed contractor demand. A planned date alone does not establish construction or completion.
Description supplied by the source
This proposed South Hodgen BEAD project will provide up to 1000/1000 Mbps symmetrical service via a 2.5Ghz and 5G licensed fixed wireless network which utilizes the contiguous channels within the Tribal 2.5Ghz allocation. This project comprises 7 Network Expansion Territories (NETs), 2 of which could be severable. The 7 NETs include 597 unserved and underserved Broadband Serviceable Locations (BSLs) and 9 Community Anchor Institutions (CAIs), for a total of 597 eligible BSLs. This project will deploy 3 new 195’ towers and retrofit 3 existing towers, with 2 tower cabinet connected to 5 miles of underground fiber backhaul and constructing a wireless microwave backhaul to 6 tower sites allowing for robust expansion and evolution in the future.
Sources: NTIA dashboard extractRelated records
Same state and a recorded technology
Atlas Broadband - 1555-Tulsa+Cherokeeproject
Same state and a recorded technology
Atlas Broadband - 1559 - Tulsa+Cherokeeproject
Same state and a recorded technology
Atlas Broadband - 1623 - Washington+Cherokeeproject
Linked award holder
Choctaw Nation of Oklahomacompany
Project location
Oklahoma BEAD marketstate
Stage evidence guide
Provisional BEAD projectsstage
Limitations and interpretation
- An award is a research signal. The award holder decides its own bids and subcontracts. Confirm project status and vendor needs with them.
“Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
Sources and evidence
- NTIA dashboard extractAs of: Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-262-2128