BEAD project
360 Broadband, LLC - 360 BEAD- Pittsburg County #2 (CM61-BEAD-OK-28-3184)
Official project code: CM61-BEAD-OK-28-3184
360 Broadband, LLC - 360 BEAD- Pittsburg County #2 (CM61-BEAD-OK-28-3184) is a broadband project record in Oklahoma. Recorded technology: Fixed Wireless. Reported award: not reported. Linked award holder: 360 Broadband.
Sources: NTIA dashboard extractSummary from published records · Source as of: Apr 13, 2026 · Materially updated:
Key facts
- Official project code
- CM61-BEAD-OK-28-3184 Sources: NTIA dashboard extract
- Project state or territory
- Oklahoma Sources: NTIA dashboard extract
- Reported award
- Not reportedReporting period: 2026-04-13 Sources: NTIA dashboard extract
- Planned service locations
- Not reportedReporting period: 2026-04-13 Sources: NTIA dashboard extract
- Recorded deployment technologies
- Fixed Wireless Sources: NTIA dashboard extract
- Project award status
- Provisional Sources: NTIA dashboard extract
- Planned start
- 2026-07-06Planned date — not evidence that work occurred. Sources: NTIA dashboard extract
- Planned completion
- 2028-01-05Planned date — not evidence that work occurred. Sources: NTIA dashboard extract
An award is not an open solicitation, revenue, cash received, or guaranteed contractor demand. A planned date alone does not establish construction or completion.
Description supplied by the source
360 Broadband LLC, in partnership with Trans-Tel Central, proposes the deployment of a fiber-to-the-premises (FTTP) network in Pittsburg County, Oklahoma—referred to as Pittsburg County #2. This BEAD-funded project will provide high-speed, reliable broadband service to 242 unserved and underserved locations across the county. The proposed design leverages a hybrid of aerial and underground fiber construction, covering approximately 81.68 miles of distribution fiber and 13.75 miles of service drops.\\n\\nThe GPON-based network will support symmetrical 1 Gbps service with a scalable path to 10 Gbps, ensuring long-term service quality and future upgrade capability. Approximately 95% of the deployment will utilize aerial fiber to reduce labor costs and expedite construction, while all buried segments will be installed in conduit to protect infrastructure and support future expansion.\\n\\nThis project represents a total estimated investment of $5,460,733.61, including construction, engineering, permitting, legal, and management costs. The project timeline anticipates a 12-month completion period, including design, permitting, make-ready work, construction, and closeout. All design and construction activities will adhere to BEAD and NTIA technical standards, with built-in redundancies and spare capacity to accommodate future growth.\\n\\n360 Broadband has developed a detailed pro forma financial analysis indicating long-term sustainability, with positive cash flow projected within four years and full alignment with BEAD performance and adoption benchmarks. By extending critical broadband infrastructure into historically underserved areas, this project will deliver transformational digital access to residents and anchor institutions across Pittsburg County.
Sources: NTIA dashboard extractRelated records
Linked award holder
360 Broadbandcompany
Same state and a recorded technology
Atlas Broadband - 1555-Tulsa+Cherokeeproject
Same state and a recorded technology
Atlas Broadband - 1559 - Tulsa+Cherokeeproject
Same state and a recorded technology
Atlas Broadband - 1623 - Washington+Cherokeeproject
Project location
Oklahoma BEAD marketstate
Stage evidence guide
Provisional BEAD projectsstage
Limitations and interpretation
- An award is a research signal. The award holder decides its own bids and subcontracts. Confirm project status and vendor needs with them.
“Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
Sources and evidence
- NTIA dashboard extractAs of: Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-28-3184