BEAD project
360 Broadband, LLC - 360 BEAD- Bryan County #3 (CM61-BEAD-OK-28-3182)
Official project code: CM61-BEAD-OK-28-3182
360 Broadband, LLC - 360 BEAD- Bryan County #3 (CM61-BEAD-OK-28-3182) is a broadband project record in Oklahoma. Recorded technology: Fixed Wireless. Reported award: not reported. Linked award holder: 360 Broadband.
Sources: NTIA dashboard extractSummary from published records · Source as of: Apr 13, 2026 · Materially updated:
Key facts
- Official project code
- CM61-BEAD-OK-28-3182 Sources: NTIA dashboard extract
- Project state or territory
- Oklahoma Sources: NTIA dashboard extract
- Reported award
- Not reportedReporting period: 2026-04-13 Sources: NTIA dashboard extract
- Planned service locations
- Not reportedReporting period: 2026-04-13 Sources: NTIA dashboard extract
- Recorded deployment technologies
- Fixed Wireless Sources: NTIA dashboard extract
- Project award status
- Provisional Sources: NTIA dashboard extract
- Planned start
- 2026-07-06Planned date — not evidence that work occurred. Sources: NTIA dashboard extract
- Planned completion
- 2028-01-05Planned date — not evidence that work occurred. Sources: NTIA dashboard extract
An award is not an open solicitation, revenue, cash received, or guaranteed contractor demand. A planned date alone does not establish construction or completion.
Description supplied by the source
The Bryan County #3 project is a targeted fiber-to-the-premises (FTTP) deployment designed to serve 565 eligible broadband serviceable locations (BSLs) in rural areas of Bryan County, Oklahoma. Led by 360 Broadband LLC in partnership with Trans-Tel Central, this project is part of a broader initiative to close the digital divide in southeastern Oklahoma through the Broadband Equity, Access, and Deployment (BEAD) program.\\n\\nThe proposed network will span approximately 161.94 miles of mainline fiber with an additional 32.10 miles of service drops, engineered primarily along existing roadways for cost efficiency and ease of access. The infrastructure utilizes a GPON architecture, leveraging a mix of aerial and buried fiber—with 95% of the deployment using aerial placement to minimize environmental impact and reduce construction costs. All buried fiber will be placed in conduit, with a second duct reserved for future growth and resiliency.\\n\\nThis deployment is engineered to support gigabit symmetrical service at launch, with all components sized and configured to accommodate 10G+ upgrades over time. Strategic cable sizing, conservative split ratios, and XGS-PON-ready hardware ensure long-term scalability without the need for disruptive overbuilds.\\n\\nThe project’s estimated capital expenditure is approximately $8.86 million. Construction is anticipated to span 12 months, with final engineering, permitting, and pole attachment applications scheduled to begin in late 2025. The build will rely on a combined workforce of experienced in-house staff and subcontracted crews, with support from regional partners and local institutions.\\n\\n360 Broadband will also implement a robust adoption strategy, including Affordable Connectivity Program (ACP) enrollment, community outreach events, and digital literacy initiatives. This ensures that broadband access translates into meaningful connectivity, particularly for unserved and underserved residents.\\n\\nUltimately, the Bryan County #3 BEAD project represents a critical investment in the county’s long-term digital infrastructure, economic development, and educational opportunity.\\n\\n
Sources: NTIA dashboard extractRelated records
Linked award holder
360 Broadbandcompany
Same state and a recorded technology
Atlas Broadband - 1555-Tulsa+Cherokeeproject
Same state and a recorded technology
Atlas Broadband - 1559 - Tulsa+Cherokeeproject
Same state and a recorded technology
Atlas Broadband - 1623 - Washington+Cherokeeproject
Project location
Oklahoma BEAD marketstate
Stage evidence guide
Provisional BEAD projectsstage
Limitations and interpretation
- An award is a research signal. The award holder decides its own bids and subcontracts. Confirm project status and vendor needs with them.
“Not reported” means missing information, not zero. Completed and withdrawn records can remain available as historical records.
Sources and evidence
- NTIA dashboard extractAs of: Apr 13, 2026 · Record: ntia_powerbi:OK:CM61-BEAD-OK-28-3182