# Wind River Reservation Data Center Feasibility Study

> Proposed: a data center in Fremont County, Wyoming, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.

Page: https://kapwork.com/grow/directory/datacenters/wind-river-reservation-data-center-feasibility-study-wy-dc_bdea6317f5d8  
Markdown: https://kapwork.com/grow/directory/datacenters/wind-river-reservation-data-center-feasibility-study-wy-dc_bdea6317f5d8.md  
Updated: Nov 3, 2026  
Publisher: Kapwork Grow, a free directory of public records

Northern Arapaho Tribe has proposed a data center in Fremont County, Wyoming (proposed). One source reports this facility in the Kapwork Grow tracker. (Kapwork Grow tracker record, merged from the sources listed here, Server Country project record (CC BY 4.0), as of Nov 2, 2026)

## Facts

- **Operator:** Northern Arapaho Tribe (Server Country project record (CC BY 4.0), as of Sep 24, 2026)
- **Stage:** Proposed (Server Country project record (CC BY 4.0), as of Sep 24, 2026)
- **Announced:** Apr 16, 2026 (Server Country project record (CC BY 4.0), as of Sep 24, 2026)
- **County:** Fremont County (Server Country project record (CC BY 4.0), as of Sep 24, 2026)
- **State:** Wyoming (Server Country project record (CC BY 4.0), as of Sep 24, 2026)
- **Facility type:** Enterprise (Kapwork Grow tracker record, merged from the sources listed here, as of Nov 2, 2026)

## What each source reports

| Dataset | Reported name | Reported status | Reported MW |
| --- | --- | --- | --- |
| Server Country | Wind River Reservation Data Center Feasibility Study | Proposed | Not reported |

## Questions this page answers

### Is Wind River Reservation Data Center Feasibility Study under construction?

No permit record shows it yet, so this page prints it as announced. Server Country (Sep 24, 2026) reports it as proposed.

### Who is building Wind River Reservation Data Center Feasibility Study?

Northern Arapaho Tribe is the operator. No public record names the general contractor yet. It shows here the day one does.

### Which carriers serve Wind River Reservation Data Center Feasibility Study?

No public record names them yet. They show here when a filing does.

### How do contractors on Wind River Reservation Data Center Feasibility Study get paid sooner?

The owner pays the general contractor, and the general contractor pays its subcontractors. Once your customer approves your invoice, certify it with Kapwork. Funders compete to fund it, so you don't wait for the payment date. Free for businesses. Kapwork doesn't lend and doesn't contact your customer.

## Latest updates

- **Apr 16, 2026:** [Reported as announced](https://servercountry.org/data/projects/)

## Related records

- [ETC DC OpCo Lysite Data Center ("1 MW DC Site")](https://kapwork.com/grow/directory/datacenters/etc-dc-opco-lysite-data-center-1-mw-dc-site-wy-dc_829beec98c9d): Same state
- [Meta Cheyenne Data Center](https://kapwork.com/grow/directory/datacenters/meta-cheyenne-data-center-wy-dc_3f7193ab8bbb): Same state
- [Microsoft Azure Data Centers - Cheyenne](https://kapwork.com/grow/directory/datacenters/microsoft-azure-data-centers-cheyenne-wy-dc_69cc0ec7405b): Same state
- [Microsoft Cheyenne Mega-Campus Expansion](https://kapwork.com/grow/directory/datacenters/microsoft-cheyenne-mega-campus-expansion-wy-dc_c93b89611b8e): Same state
- [Project Tembo](https://kapwork.com/grow/directory/datacenters/project-tembo-wy-dc_3cae746c3b97): Same state

## What this record does not show

- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-11-02. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

## Sources

- [Server Country project record (CC BY 4.0)](https://servercountry.org/data/projects/) · as of Sep 24, 2026 · record 1047
- [Kapwork Grow tracker record, merged from the sources listed here](https://kapwork.com/app/grow/datacenters/projects/wind-river-reservation-data-center-feasibility-study-wy) · as of Nov 2, 2026 · record 208814382511576

## Have an invoice your customer approved?

Certify your approved invoices. Funders compete to fund them. Multiple offers. No notice of assignment. Free for businesses.

- [Get offers](https://kapwork.com/app/register-originator?mode=express&flow=invoice_registration&source=growth_suite&intent=certify&return_to=%2Fapp%2Finvoices%2Fnew&entry_point=certify_public_directory)
- [Talk to an expert](https://meetings.hubspot.com/kylemase/kapwork-intro-with-kyle-mauricio)

## Cite this page

Kapwork Grow, "Wind River Reservation Data Center Feasibility Study", https://kapwork.com/grow/directory/datacenters/wind-river-reservation-data-center-feasibility-study-wy-dc_bdea6317f5d8, materially updated Nov 3, 2026.