# STACK Infrastructure San Jose Expansion

> Under construction: a 60 MW data center in Santa Clara County, California, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.

Page: https://kapwork.com/grow/directory/datacenters/stack-infrastructure-san-jose-expansion-ca-dc_601bbe07c362  
Markdown: https://kapwork.com/grow/directory/datacenters/stack-infrastructure-san-jose-expansion-ca-dc_601bbe07c362.md  
Updated: Nov 3, 2026  
Publisher: Kapwork Grow, a free directory of public records

STACK Infrastructure is building a 60 MW data center in Santa Clara County, California (under construction). One source reports this facility in the Kapwork Grow tracker. (Kapwork Grow tracker record, merged from the sources listed here, Server Country project record (CC BY 4.0), as of Nov 2, 2026)

## Facts

- **Operator:** STACK Infrastructure (Server Country project record (CC BY 4.0), as of Sep 24, 2026)
- **Stage:** Under construction (Server Country project record (CC BY 4.0), as of Sep 24, 2026)
- **Reported capacity:** 60 MW (Server Country project record (CC BY 4.0), as of Sep 24, 2026)
- **Reported IT load:** 60 MW (Kapwork Grow tracker record, merged from the sources listed here, as of Nov 2, 2026)
- **Reported building area:** 658,767 sq ft (Kapwork Grow tracker record, merged from the sources listed here, as of Nov 2, 2026)
- **Reported investment:** $420.0M (Kapwork Grow tracker record, merged from the sources listed here, as of Nov 2, 2026)
- **Reported jobs:** 200 (Kapwork Grow tracker record, merged from the sources listed here, as of Nov 2, 2026)
- **Announced:** 2024 (Server Country project record (CC BY 4.0), as of Sep 24, 2026)
- **Construction start reported:** Mar 26, 2024 (Server Country project record (CC BY 4.0), as of Sep 24, 2026)
- **Expected completion:** 2026 (Server Country project record (CC BY 4.0), as of Sep 24, 2026)
- **City:** San Jose (Server Country project record (CC BY 4.0), as of Sep 24, 2026)
- **County:** Santa Clara County (Server Country project record (CC BY 4.0), as of Sep 24, 2026)
- **State:** California (Server Country project record (CC BY 4.0), as of Sep 24, 2026)
- **Location precision:** Approximate: city centroid (Kapwork Grow tracker record, merged from the sources listed here, as of Nov 2, 2026)
- **Facility type:** Enterprise (Kapwork Grow tracker record, merged from the sources listed here, as of Nov 2, 2026)

## What each source reports

| Dataset | Reported name | Reported status | Reported MW |
| --- | --- | --- | --- |
| Server Country | STACK Infrastructure San Jose Expansion | Under construction | 60 MW |

## Questions this page answers

### Is STACK Infrastructure San Jose Expansion under construction?

No permit record shows it yet, so this page prints it as announced. Server Country (Sep 24, 2026) reports it as under construction.

### Who is building STACK Infrastructure San Jose Expansion?

STACK Infrastructure is the operator. No public record names the general contractor yet. It shows here the day one does.

### When is STACK Infrastructure San Jose Expansion expected to finish?

Server Country reports expected completion in 2026. That is a reported target, not a schedule.

### Which carriers serve STACK Infrastructure San Jose Expansion?

No public record names them yet. They show here when a filing does.

### How do contractors on STACK Infrastructure San Jose Expansion get paid sooner?

The owner pays the general contractor, and the general contractor pays its subcontractors. Once your customer approves your invoice, certify it with Kapwork. Funders compete to fund it, so you don't wait for the payment date. Free for businesses. Kapwork doesn't lend and doesn't contact your customer.

## Latest updates

- [Expected completion reported](https://servercountry.org/data/projects/). Reported for 2026.
- **Mar 26, 2024:** [Construction start reported](https://servercountry.org/data/projects/)
- [Reported as announced](https://servercountry.org/data/projects/). Reported for 2024.

## Related records

- [Berry Hill / Southern Virginia Megasite](https://kapwork.com/grow/directory/datacenters/berry-hill-southern-virginia-megasite-va-dc_ff743991028b): Same operator
- [Bossier Parish Campus (with Amazon)](https://kapwork.com/grow/directory/datacenters/bossier-parish-campus-with-amazon-la-dc_04f4ce02f93e): Same operator
- [Caddo Parish Campus (with Amazon)](https://kapwork.com/grow/directory/datacenters/caddo-parish-campus-with-amazon-la-dc_37b7c1633e14): Same operator
- [STACK DFW02 (Lancaster)](https://kapwork.com/grow/directory/datacenters/stack-dfw02-lancaster-tx-dc_f6a5324e7cc7): Same operator
- [STACK Hillsboro Campus](https://kapwork.com/grow/directory/datacenters/stack-hillsboro-campus-or-dc_e686096e8bb4): Same operator
- [AVAIO Digital Perseus](https://kapwork.com/grow/directory/datacenters/avaio-digital-perseus-ca-dc_772977f86b3f): Same state
- [AVAIO Pittsburg Perseus Data Center](https://kapwork.com/grow/directory/datacenters/avaio-pittsburg-perseus-data-center-ca-dc_f598b2c10a60): Same state
- [Amazon AWS Gilroy Data Center](https://kapwork.com/grow/directory/datacenters/amazon-aws-gilroy-data-center-ca-dc_c3736908344a): Same state
- [Arcadis/Terra Ventures San Jose Sustainable Data Center](https://kapwork.com/grow/directory/datacenters/arcadis-terra-ventures-san-jose-sustainable-data-center-ca-dc_f8d7173e2f9e): Same state
- [Buena Vista AI Factory](https://kapwork.com/grow/directory/datacenters/buena-vista-ai-factory-ca-dc_0307366c0af7): Same state

## What this record does not show

- This record is the Kapwork Grow tracker's merged view of a facility, from the tracker snapshot built 2026-11-02. Facts tagged KW are the tracker's resolved values; the per-source rows it was merged from are listed under Sources and on the tracker record.
- Sources on this record: Server Country, https://servercountry.org/data/ (CC BY 4.0). Every source is licensed for commercial use with attribution.
- An announced or permitted build is not a contract, an open bid or a purchase order.
- Capacity figures are as reported by the cited sources and may describe planned rather than energised capacity.

## Sources

- [Server Country project record (CC BY 4.0)](https://servercountry.org/data/projects/) · as of Sep 24, 2026 · record 0051
- [Kapwork Grow tracker record, merged from the sources listed here](https://kapwork.com/app/grow/datacenters/projects/stack-infrastructure-san-jose-expansion-ca) · as of Nov 2, 2026 · record 105672268563298

## Have an invoice your customer approved?

Certify your approved invoices. Funders compete to fund them. Multiple offers. No notice of assignment. Free for businesses.

- [Get offers](https://kapwork.com/app/register-originator?mode=express&flow=invoice_registration&source=growth_suite&intent=certify&return_to=%2Fapp%2Finvoices%2Fnew&entry_point=certify_public_directory)
- [Talk to an expert](https://meetings.hubspot.com/kylemase/kapwork-intro-with-kyle-mauricio)

## Cite this page

Kapwork Grow, "STACK Infrastructure San Jose Expansion", https://kapwork.com/grow/directory/datacenters/stack-infrastructure-san-jose-expansion-ca-dc_601bbe07c362, materially updated Nov 3, 2026.
