# Data center builds — page 2

> Every proposed, approved, under-construction and expanding data center in Kapwork Grow, the same snapshot the app serves, with a source and a date on every fact.

Page: https://kapwork.com/grow/directory/datacenters/page/2  
Markdown: https://kapwork.com/grow/directory/datacenters/page/2.md  
Updated: Nov 12, 2026  
Publisher: Kapwork Grow, a free directory of public records

## Records, page 2 of 44

1,316 records in all.

- [Aligned CMH-02 Conesville Data Center Campus](https://kapwork.com/grow/directory/datacenters/aligned-cmh-02-conesville-data-center-campus-oh-dc_5b5235627394): Under construction: a 600 MW data center in Coshocton County, Ohio, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Aligned Coal City Campus](https://kapwork.com/grow/directory/datacenters/aligned-coal-city-campus-il-dc_f0695145cb9f): Proposed: a data center in Grundy County, Illinois, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Aligned Data Centers - Critical Digital Infrastructure Facility](https://kapwork.com/grow/directory/datacenters/aligned-data-centers-critical-digital-infrastructure-facility-md-dc_3d5c1d5574c1): Under construction: a 264 MW data center in Frederick County, Maryland, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Aligned Data Centers - Elk Grove Village Campus](https://kapwork.com/grow/directory/datacenters/aligned-data-centers-elk-grove-village-campus-il-dc_b4ca4e6c9abb): Proposed: a 100 MW data center in Cook County, Illinois, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Aligned Data Centers – Conesville Industrial Park](https://kapwork.com/grow/directory/datacenters/aligned-data-centers-conesville-industrial-park-oh-dc_81bee2816489): Under construction: a 340 MW data center in Coshocton County, Ohio, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Aligned Data Centers Amber Site (Grady County)](https://kapwork.com/grow/directory/datacenters/aligned-data-centers-amber-site-grady-county-ok-dc_72541d6e90dd): Proposed: a data center in Grady County, Oklahoma, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Aligned Data Centers Hillsboro Campus (PDX-01/PDX-02)](https://kapwork.com/grow/directory/datacenters/aligned-data-centers-hillsboro-campus-pdx-01-pdx-02-or-dc_89bbcc73d762): Under construction: a 108 MW data center in Washington County, Oregon, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Aligned Data Centers IAD-04 Frederick](https://kapwork.com/grow/directory/datacenters/aligned-data-centers-iad-04-frederick-md-dc_bd76395e4f8d): Under construction: a 72 MW data center in Frederick County, Maryland, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Aligned Data Centers IAD-06 Frederick](https://kapwork.com/grow/directory/datacenters/aligned-data-centers-iad-06-frederick-md-dc_6807da713f08): Under construction: a 72 MW data center in Frederick County, Maryland, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Aligned Data Centers Phoenix Campus](https://kapwork.com/grow/directory/datacenters/aligned-data-centers-phoenix-campus-az-dc_1cf898266884): Expanding: a 180 MW data center in Maricopa County, Arizona, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Aligned Data Centers Project Caprock](https://kapwork.com/grow/directory/datacenters/aligned-data-centers-project-caprock-tx-dc_3c677fc36904): Under construction: a 540 MW data center in Hale County, Texas, from the Kapwork Grow tracker (2 sources). Sources and dates on every fact.
- [Aligned HPC Campus at Former Pixelle Paper Mill (Chillicothe)](https://kapwork.com/grow/directory/datacenters/aligned-hpc-campus-at-former-pixelle-paper-mill-chillicothe-oh-dc_8f4e8adbf53c): Proposed: a data center in Ross County, Ohio, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Aligned NEO-01](https://kapwork.com/grow/directory/datacenters/aligned-neo-01-oh-dc_14731092e197): Under construction: a 96 MW data center in Erie County, Ohio, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Aligned NEO-01 Campus](https://kapwork.com/grow/directory/datacenters/aligned-neo-01-campus-oh-dc_af0b5737fb36): Under construction: a 96 MW data center in Erie County, Ohio, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Aligned ORD-03](https://kapwork.com/grow/directory/datacenters/aligned-ord-03-il-dc_99090f8d970b): Under construction: a data center in Cook County, Illinois, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Aligned PHX-13](https://kapwork.com/grow/directory/datacenters/aligned-phx-13-az-dc_a85cfbe2ff01): Under construction: a 72 MW data center in Maricopa County, Arizona, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Aliquippa Data Center (former J&L Steel site)](https://kapwork.com/grow/directory/datacenters/aliquippa-data-center-former-j-l-steel-site-pa-dc_901f633acc1c): Proposed: a 496 MW data center in Beaver County, Pennsylvania, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [AlohaNAP Expansion](https://kapwork.com/grow/directory/datacenters/alohanap-expansion-hi-dc_4c2a1ad9a688): Under construction: a 1.5 MW data center in Honolulu County, Hawaii, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Alpha Technologies Huntington Headquarters Data Center](https://kapwork.com/grow/directory/datacenters/alpha-technologies-huntington-headquarters-data-center-wv-dc_48022b29f842): Under construction: a 9 MW data center in Cabell County, West Virginia, from the Kapwork Grow tracker (2 sources). Sources and dates on every fact.
- [Alterra Marshall Technology & Energy Center](https://kapwork.com/grow/directory/datacenters/alterra-marshall-technology-energy-center-mi-dc_28289b256346): Proposed: a 1400 MW data center in Calhoun County, Michigan, from the Kapwork Grow tracker (2 sources). Sources and dates on every fact.
- [Amazon AWS Arlington Expansion](https://kapwork.com/grow/directory/datacenters/amazon-aws-arlington-expansion-or-dc_12d756adb3a1): Proposed: a 500 MW data center in Gilliam County, Oregon, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Amazon AWS Gilroy Data Center](https://kapwork.com/grow/directory/datacenters/amazon-aws-gilroy-data-center-ca-dc_c3736908344a): Under construction: a 98 MW data center in Santa Clara County, California, from the Kapwork Grow tracker (2 sources). Sources and dates on every fact.
- [Amazon AWS Hermiston Data Centers](https://kapwork.com/grow/directory/datacenters/amazon-aws-hermiston-data-centers-or-dc_166ac0f991c6): Under construction: a 200 MW data center in Umatilla County, Oregon, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Amazon AWS Phoenix Data Centers](https://kapwork.com/grow/directory/datacenters/amazon-aws-phoenix-data-centers-az-dc_dc7c4a523219): Under construction: a 600 MW data center in Maricopa County, Arizona, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Amazon AWS Project Blue (Tucson)](https://kapwork.com/grow/directory/datacenters/amazon-aws-project-blue-tucson-az-dc_118d98934057): Under construction: a 286 MW data center in Pima County, Arizona, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Amazon AWS US West (Oregon) Region - Boardman](https://kapwork.com/grow/directory/datacenters/amazon-aws-us-west-oregon-region-boardman-or-dc_398256a8a888): Expanding: a 266 MW data center in Morrow County, Oregon, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Amazon AWS Worcester County Properties](https://kapwork.com/grow/directory/datacenters/amazon-aws-worcester-county-properties-ma-dc_0c3d28debe82): Proposed: a data center in Worcester County, Massachusetts, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Amazon Data Services Creekside Campus](https://kapwork.com/grow/directory/datacenters/amazon-data-services-creekside-campus-tx-dc_8b939ea01ca6): Proposed: a data center in Bastrop County, Texas, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Amazon Data Services Grafton](https://kapwork.com/grow/directory/datacenters/amazon-data-services-grafton-ma-dc_402a870f0566): Proposed: a data center in Worcester County, Massachusetts, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.
- [Amazon Data Services Reno Data Center Campus](https://kapwork.com/grow/directory/datacenters/amazon-data-services-reno-data-center-campus-nv-dc_331ed48f3ef4): Under construction: a data center in Storey County, Nevada, from the Kapwork Grow tracker (1 source). Sources and dates on every fact.

## More pages

- [Previous page](https://kapwork.com/grow/directory/datacenters.md)
- [Next page](https://kapwork.com/grow/directory/datacenters/page/3.md)

## Have an invoice your customer approved?

Certify your approved invoices. Funders compete to fund them. Multiple offers. No notice of assignment. Free for businesses.

- [Get offers](https://kapwork.com/app/register-originator?mode=express&flow=invoice_registration&source=growth_suite&intent=certify&return_to=%2Fapp%2Finvoices%2Fnew&entry_point=certify_public_directory)
- [Talk to an expert](https://meetings.hubspot.com/kylemase/kapwork-intro-with-kyle-mauricio)